Ongoing Projects

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo. labore et dolore magna aliqua.

TRTS Tunnel

Constructions of tunnel and transitions including cut and cover (Deleted portions of the work from package -21 ) Under Taraka Rama Thirtha sagaram reservier project kotangandredu(V), Gurla (M), Vizayanagarm (Dist), Andra Pradesh.

Total Length of Tunnel : 980 mtrs

Dia of Finished tunnel : 6.0 mtrs

Work Value : 51.43 Crores.

PENNA BARRAGE

Balance work of Package No.6-Invesgaon,
design, drawings, esmaon and construcon of Barrage-CumBridge across river pennar in Nellore Town of Nellore DistrictIncluding fabricaon of Gates and electrically operated Hoist Bridge arrangements and other related works, commissioning of the same and maintenance of the Barrage for Two Years etc.

Work Value: 92.37 Crores.
(RRCIIPL Part – 61.88)

Railway LHS work

1. Construcon of Limited Height Subways in lieu of Closing of Manned Level Crossing No.ML – 429 & ML – 431 between Srikakulam Road – Ponduru staons on Main Line und er the jurisdicon of Assistant Divisiona l Engineer/Srikakulam Road of WALTAIR Division. 2.Construcon of Limited Height Subway in lieu of Closing of Manned Level Crossing No. ML -404 at Km.718/25-27 at Kotabommali Yard on Main Line under the jurisdicon of Assistant Divisional Engineer/Srikakulam Road of WALTAIR Division. Andhra Pradesh

Work Value: 12.51 Crores.

Reservoirs

for Formaon of Balancing Reservoirs 3 Nos. 1.Mudivedu Balancing Reservoir near Mudivedu Village in Kurabalakota Mandal 2.Nethiguntapalli Balancing Reservoir near Nethiguntapalli Village in Punganur Mandal 3.Avulapalli Balancing Reservoir near Avulapalli Village in Somala mandal of Chioor District under EPC Turnkey System Project (the
“Project”). Andhra Pradesh

Total Capacity of Reservoirs : 6.5 TMC
Work Value: 1553.96 Crores.
RRCIIPL Part: 761.44 Crores

ANIMAL UNDER PASSES

Construcon of 2 Nos of Animal Under passes at Nagbhid – Bramhapuri – Armori Road, NH -353D in Km. 97+487 to Km. 137+250 (Km.109+500 & 111+175 in Chandrapur Dist on EPC mode in state Maharashtra

Work Value: 39.56 Crores.

BARRAGE WORK

Construcon of In-stream storage structure at Jakameripalli across River Ghodahada in district Ganjam (D/S of confluence of River Ramanadiand Ghodahada) on EPC basis including O&M of complete commissioned schemes for five years. Odisha

Work Value: 48.57 Crores.

CANAL WORK

Construcon of Balance Earthwork, Cut and Cover, Lining and Structures from RD 20590 m to 26400 m on Ghodazari Branch Canal Maharashtra

Work Value: 49.38 Crores.

Pipe Line Distribuon

Construcon of Pipe Line Distribuon Network For a Command Area of 3039 Ha. of Zone-II Including Surveying, Designing, Drawing and construcon along with delivery Chamber including formaon of WUA, Handing over the Command Area to WUA, Maintaning the system for a period of 60 month aer compleon of construcon, out off which first 3 year irrigaon with WUA and next two year handing over the area to WUA of Garga Medium Project Tq. Dharni Dist. Amrava, Maharashtra

Work Value: 51.60 Crores

CANAL WORK

Earth work excavaon of Gudisibanda Distributory km. 198.050 of Punganur branch canal consisng of Gudisibanda Major from Km. 0/0 to Km.9.452 and 1R minor from Km.0/0 to Km.3.150 Chinnahalsapuram minor from Km.0.00 to Km.3.975 including construcon of CM & CD works and one Li and Distributory system to feed an ayacut of 4000 Acres (1400 Acres under exisng tanks by providing supply channel to tanks and 2600 Acres new Ayacut under khariff I.D in Punganur and Peddapanjani mandals of Chioor under HNSS system

Work Value: 18.94 Crores.

CANAL WORK

HNSS Project Phase-II-Invesgaon, Preparaon of Hydraulic Parculars, Designs and Drawings for Earth work Excavaon of HNSS Kuppam Branch Canal from KM 0.000 to KM 143.900 including Construcon of CM 7 CD works including 3 lis to feed an ayacut of 6300 Acres under tanks and to provide drinking water for 8 Mandals in Palamaner and Kuppam Constuencies  Balance Civil Works 

Work Value: 62.98 Crores.

RAILWAY TUNNEL WORK

Construcon of 4 no. single line BG Tunnels (approx total length 1200 RM) between Km 28.300 to Km 35.100 including 50m cung on each face of all tunnel for opening of face in connecon with construcon of New BG Rail line from Koderma to Tilaiya under jurisdicon of Dy.CE/C/DHN

Work Value: 56.21 Crores.

NSK 61

NSK 61 A) Impro vement t o Sujalpur
Samsherpur Karankheda Dhekwad R oad SH-11 from Km 0/000 to km 44/700 (Sujalpur – Dhekwad) B) Improvement of Amlad Mod Borad Shahada Aslod Shahana to District Border Road SH-1 Km 14/500 to km 67/700 Tal. Shahada Dist. Nandurbar (Taloda – Shahad) in the State of Maharashtra on EPC Mode.

Length of Project : 86.25 Km
Work Value : 282.30 Crores.

NSK 62

NSK 62 A) Improvement to Molgi – abAkkalkuwa Road SH-3 from Km 0/000 to 30/600 T Al. Akkalkuwa, Dist. Nandurbar B) Improvement t o Roads in Prakasha- aijali-Katharda-Kalsadi-Mhasawad- oranmal Roa d SH-2 fr om Km 0 /0 00 to 2 2/ 90 0 Tal . Shahada/Dhadgaon Dist Nandurbar in the State of Maharashtra on EPC Mode.

Length of Project : 52.52 Km
Work Value : 135.20 Crores.

PDN WORK

Creation of Irrigation Potential of 3146 Ha
by Pro viding Irrigation facilities to CCA 2509 Ha. by Construction of P D N for Nimgaon and Ambhora Distributories and Na vegaon, Thergaon, Thergaon no. 2, Belgaon, Belgaon Tail, Mokhala left and Right Minors on a Vyahad Branch of Asolamendha main Canal of Gosikhur d Project.

Total Length of Pipe lines : 389 KmDia of pipes : From 63 mm to 1100 mm
Work Value: 57.00 Crores.

SANGAM BARRAGE

Construction of Barrage-Cum-Bridge across Pennar River near Sangam Village & Mandal of S.P.S.R Nellore Distri ct. Investigation, Desi gns, drawings, estimations, manufacturing of Gates and erecting the same along with Hoist Bridge arrangement electrically operated, commissioning of the same and maintenance of the barrage for two years.

Total Length of Barrage: 1195 mtrs
Number of Vertical Gates : 85 nos (12 mtr x 3.2 mtr)
Work Value: 102.00 Crores.

KRMC Tunnel 1

Name of Work: Construction of Canal Tunnel at KM 24.97 to KM 26.92 and KM 46.83 to KM 47.91 of Murakati Branch Canal ex. From KM 29.83 of K.R.M.C. on Turnkey basis. 

Total Length of Tunnel : 3030 mtrs Dia of Finished tunnel : 7.0 mtrs
Work Value : 162.00 Crores; RRCIIPl part 50% i.e. 81.0 Crores

KRMC Tunnel 2

Construction of Canal Tunnel at KM 8.26 to KM 8.53, KM 18.37 to KM 21.16 and KM 21.94 to KM 22.48 of Murakati Branch Canal ex. From KM 29.83 of K.R.M.C. on Turnkey basis.

Total Length of Tunnel : 3600 mtrs
Dia of Finished tunnel : 7.0 mtrs
Work Value : 190.00 Crores; RRCIIPl part 50% i.e. 95.0 Crores

KRMC Tunnel 3

Construction of Canal Tunnel at KM 0.75 to KM 3.48 and KM 4.69 to KM 6.40 of  Murakati Branch Canal ex. From KM 29.83 of K.R.M.C. on Turnkey basis.

Total Length of Tunnel : 4440 mtrs
Dia of Finished tunnel : 7.0 mtrs
Work Value : 248.00 Crores; RRCIIPl part 50% i.e. 124.0 Crores