This is probably and assumed that development and the board of channel undertakings will go on over the approaching 20 years essentially as they have done in the beyond 20. In the wake of seeing enormous improvement in foundation one might say that ventures connected with channel, water system, power and expressways have great degree.
Name Of Work | Employer | Values(INR in Lacs) | Region | Completed Date |
---|---|---|---|---|
Mudivedu Balancing Reservoir near Mudivedu Village in, Kurabalakota Mandal 2. Nethiguntapalli Balancing Reservoir near ethiguntapalli Village in Punganur Mandal 3. Avulapalli Balancing Reservoir near Avulapalli Village in Somala mandal of Chittoor District under EPC Turnkey System (NECL-RRCIIPL JV) (51-49%) – 1553.96 Cr | Water Resources Department, Government of Andhra Pradesh | 761.44 | AP | 30.06.2024 |
Construction of In-stream storage structure at Jakameripalli across River Ghodahada in district Ganjam (D/S of confiuence of River amanadiand Ghodahada) on EPC basis including O&M of complete commissioned schemes for five years. | Chikiti Irrigation Division, Berhampur, Odisha | 48.57 | Berhampur | 17.06.2024 |
Construction of Balance Earthwork, Cut and Cove, Lining and Structures from RD 20590 m to 26400 m on Ghodazari Branch Canal | Ghodazari Canal Division, Nagbhid, | 49.38 | Nagbhid | 11.11.2023 |
Construction of Pipe Line
istribution Network For a command Area of 3039 Ha. of Zone-II Including Surveying, esigning, Drawing and construction along with delivery Chamber including formation of WUA, Handing over the Command Area to WUA, Maintaning the system for a period of 60 month after completion of construction, out off which first 3 year irrigation with WUA and next two year handing over the area to WUA of Garga Medium Project Tq. Dharni Dist. Amravati | Maharashtra, Amravati Medium Project Division, Maharashtra | 51.60 | Maharashtra | 26.12.2023 |
Earth work excavation of
udisibandaDistributory km. 198.050 of Punganur branch canal consisting of Gudisibanda Major from Km. 0/0 to Km.9.452 and 1R minor from Km.0/0 to Km.3.150 Chinnahalsapuram minor from Km.0.00 to Km.3.975 including construction of CM & CD works and one Lift and Distributory system to feed an ayacut of 4000 Acres (1400Acres under existing tanks by providing supply channel to tanks and 2600 Acres new Ayacut under khariff I.D in Punganur and Peddapanjani mandals of Chittoor under HNSS system | Water Resources Department, Government of Andhra Pradesh | 18.94 | Government of Andhra Pradesh | 07.09.2023 |
HNSS Project Phase-II- nvestigation, Preparation of Hydraulic Particulars, Designs and Drawings for Earth work Excavation of HNSS Kuppam Branch Canal from KM 0.000 to KM 143.900 including Construction of CM 7 CD works including 3 lifts to feed an ayacut of 6300 Acres under tanks and to provide drinking water for 8 Mandals in Palamaner and uppam Constituencies Balance Civil Works | Water Resources Department, Government of Andhra Pradesh. | 62.98 | AP | 09.04.2023 |
Name Of Work | Employer | Values(INR in Lacs) | Region | Completed Date |
---|---|---|---|---|
Table Data | Table Data | Table Data | Table Data | Table Data |