RR Constructions

Email Address

rrciipl3366@gmail.com

Phone Number

040-23559981

Our Location

Banjarahills, Hyderbad

Irrigation Projects

About Irrigation Projects

This is probably and assumed that development and the board of channel undertakings will go on over the approaching 20 years essentially as they have done in the beyond 20. In the wake of seeing enormous improvement in foundation one might say that ventures connected with channel, water system, power and expressways have great degree.

Ongoing Projects

Name Of WorkEmployerValues(INR in Lacs)RegionCompleted Date
Mudivedu Balancing Reservoir near Mudivedu Village in,
Kurabalakota Mandal 2. Nethiguntapalli Balancing Reservoir
near ethiguntapalli Village in Punganur Mandal
3. Avulapalli Balancing Reservoir near Avulapalli Village in
Somala mandal of Chittoor District under EPC
Turnkey System (NECL-RRCIIPL JV) (51-49%) – 1553.96 Cr
Water Resources Department,
Government of Andhra Pradesh
761.44AP30.06.2024
Construction of In-stream storage structure at Jakameripalli
across River Ghodahada in district Ganjam
(D/S of confiuence of River amanadiand Ghodahada)
on EPC basis including O&M of complete commissioned
schemes for five years.
Chikiti Irrigation Division,
Berhampur, Odisha
48.57Berhampur17.06.2024
Construction of Balance Earthwork, Cut and Cove, Lining
and Structures from RD 20590 m to 26400 m on
Ghodazari Branch Canal
Ghodazari Canal Division,
Nagbhid,
49.38Nagbhid11.11.2023
Construction of Pipe Line istribution Network For a command Area
of 3039 Ha. of Zone-II Including Surveying, esigning, Drawing
and construction along with delivery Chamber including formation
of WUA, Handing over the Command Area to WUA, Maintaning
the system for a period of 60 month after completion of construction,
out off which first 3 year irrigation with WUA and next two year handing
over the area to WUA of Garga Medium Project Tq. Dharni Dist. Amravati
Maharashtra,
Amravati Medium
Project Division,
Maharashtra
51.60Maharashtra26.12.2023
Earth work excavation of udisibandaDistributory km. 198.050 of Punganur
branch canal consisting of Gudisibanda Major from Km. 0/0 to Km.9.452
and 1R minor from Km.0/0 to Km.3.150 Chinnahalsapuram minor from
Km.0.00 to Km.3.975 including construction of CM & CD works and one Lift
and Distributory system to feed an ayacut of 4000 Acres (1400Acres under existing tanks
by providing supply channel to tanks and 2600 Acres new Ayacut under khariff
I.D in Punganur and Peddapanjani mandals of Chittoor under HNSS system
Water Resources
Department, Government
of Andhra Pradesh
18.94Government of Andhra
Pradesh
07.09.2023
HNSS Project Phase-II- nvestigation, Preparation of Hydraulic Particulars,
Designs and Drawings for Earth work Excavation of HNSS Kuppam Branch
Canal from KM 0.000 to KM 143.900 including Construction of CM 7 CD works
including 3 lifts to feed an ayacut of 6300 Acres under tanks and to
provide drinking water for 8 Mandals in Palamaner and uppam
Constituencies Balance Civil Works
Water Resources
Department, Government of
Andhra Pradesh.
62.98AP09.04.2023

Completed Projects

Name Of WorkEmployerValues(INR in Lacs)RegionCompleted Date
Table DataTable DataTable DataTable DataTable Data